Requirement Check List * indicates required field Name:* Email:* What is the continuous and maximum power of the load in kVA? [E.g.: 5 kVA continuous load, 15 kVA maximum load.] What is the required output voltage and frequency? [E.g.: 220/110 VAC (1/3 phase), 50/60 Hz.] What kind of equipment will be connected to the system? [If 3-phase loads are available please clarify what they are and what their peak (inrush) current is? Specific 3-phase loads such as motors, pumps etc. have high peak (inrush) current.] What system inputs would you like to have? [E.g.: PV + DG + Grid.] What is the available free space for PV modules in m2? What back-up time is needed (in hours) and at what load (…% of the maximum load) in case of no sun and no Grid/DG available? [E.g. : 8 hours back-up time @ 30% load; E.g. Max load 10 kVA, 30% = 3 kVA for 8h.] What is the average monthly energy consumption kWh? [This information can be taken from the monthly electricity bill.] Is module for remote monitoring required?