Requirement Check List

* indicates required field
[E.g.: 5 kVA continuous load, 15 kVA maximum load.]
[E.g.: 220/110 VAC (1/3 phase), 50/60 Hz.]
[If 3-phase loads are available please clarify what they are and what their peak (inrush) current is? Specific 3-phase loads such as motors, pumps etc. have high peak (inrush) current.]
[E.g.: PV + DG + Grid.]
[E.g. : 8 hours back-up time @ 30% load; E.g. Max load 10 kVA, 30% = 3 kVA for 8h.]
[This information can be taken from the monthly electricity bill.]